Ideal for tank installations, drive/reception pits, RC structures, pump stations etc.
Varying excavation sizes can be achieved with or without clear openings and is the perfect solution for square and rectangular pits that cannot be undertaken with traditional trench/manhole box systems.

This trench shoring system offers a slide rail with one single guide for the trench shoring plates. Trench depths of max. 3.80 m deep can be achieved.

Greater excavation depths up to 8.5m deep can be achieved due to the ability to add additional shoring plates within the second guide rail.

Slide Rail can adopt a unique tie back system which enables a clear open excavation for tank installations as well as other large underground structures.